EQS-Adhoc: NEXTDC Limited: 2026 AGM - Chairman & CEO Statement

EQS-Ad-hoc: NEXTDC Limited / Key word(s): Statement/Statement
   NEXTDC Limited: 2026 AGM - Chairman & CEO Statement

   19-Nov-2026 / 23:21 CET/CEST
   Disclosure of an inside information acc. to Article 17 MAR of the
   Regulation (EU) No 596/2014, transmitted by [1]EQS News - a service of
   [2]EQS Group.
   The issuer is solely responsible for the content of this announcement.

   ══════════════════════════════════════════════════════════════════════════

   NEXTDC Limited (ASX:NXT) (‘NEXTDC’ or the ‘Company’). The ASX Market
   Announcement of the below release can also be viewed at
   [3]www.nextdc.com/investor-centre. The information is being provided for
   the holders of NEXTDC’s A$1,100,000,000 1.75 per cent. Subordinated
   Convertible Notes due 2031 (ISIN XS3485473303) admitted to trading on the
   Vienna MTF of the Vienna Stock Exchange.

   The AGM presentation accompanying this announcement has also been released
   on the ASX can also be viewed at [4]www.nextdc.com/investor-centre.

   ASX Release
   20 November 2026
     2026 AGM – Chairman and CEO’s Address Chairman’s Address
   Whether you are here in the auditorium at the Hilton Hotel or joining
   online from around Australia and beyond – Welcome. Today marks my 13^th
   and final AGM as Chairman of NEXTDC.
   We appreciate that the recent update about the delay at M3 and revision to
   our FY27 guidance on 21 October 2026 is of great interest to shareholders.
   We know you are disappointed and have questions.
   The Board and management will address these events in detail today.
   I want to open my remarks by affirming that NEXTDC’s long-term investment
   case remains intact.  Demand for high-quality digital infrastructure
   continues to grow as the demand for compute expands significantly.
   NEXTDC has what it takes to meet that demand: strategically valuable
   assets, strong customer demand and a significant contracted pipeline. The
   recent M3 issues have also made one thing clear: our approach to execution
   risk must change.
   As a result, we’ve reset our FY27 guidance in October with an upgrade to
   net revenue and Underlying EBITDA guidance announced this morning. We
   reviewed our capital program and reaffirmed our capital expenditure
   guidance this morning.
   Growth remains important, but it must be pursued with strict financial and
   operational rigour. NEXTDC is focused on converting contracted demand into
   earnings and cash flow, with a focus on delivering risk-adjusted
   shareholder returns. That is how we will restore confidence and deliver
   the long-term opportunity ahead.
   So, before we move to the formal business of today’s meeting, I want to
   address three areas. First, why NEXTDC is well positioned to capture the
   long-term opportunity ahead. Second, the recent acquisition of a 9.9%
   interest in NEXTDC by Goodman Group and Digital Realty and the Board’s
   focus on maximising value for all shareholders. And third, our plan to
   deliver value, including our response to M3 and the actions we are taking
   to strengthen that project.

   i) The NEXTDC Opportunity
   We acknowledge there’s growing community opposition to data centres in
   Australia and worldwide. I want to point out that NEXTDC only builds data
   centres on land zoned as industrial. Given community sensitivities we do
   not intend to pursue new development opportunities that are near
   residential properties.
   Despite the recent power delay at M3, the underlying opportunity for
   NEXTDC remains significant. We have a portfolio of world-class
   infrastructure and have delivered our best ever contracting year during
   FY26 with a Forward Order Book of approximately 565MW.
   We have a significant development pipeline of over 5GW across Australia
   and our international markets, giving NEXTDC considerable long-term growth
   optionality. Cloud growth, digitisation and AI are driving sustained
   demand for data centre infrastructure.
   Our focus is firmly on delivery – converting our contracted capacity into
   revenue and operating cash flow, while continuing to serve and deepen our
   customer relationships. We also have substantial balance sheet strength,
   which I will come to shortly.
   So, the investment case remains intact: strategically valuable assets,
   strong customer demand and a significant contracted pipeline.

   ii) FY26 Highlights
   NEXTDC achieved a number of significant milestones and experienced a
   strong period of growth in fiscal 2026. This was the largest contracting
   year in NEXTDC’s history.
   Net revenue and Underlying EBITDA both exceeded the top end of the FY26
   guidance range. Billing utilisation increased materially as contracted
   capacity began converting into revenue.
   NEXTDC ended the year with a record increase in contracted utilisation,
   the Forward Order Book at record levels, as well as a strengthened balance
   sheet. These results demonstrate the underlying demand for the platform
   and the scale of the opportunity ahead.
   Before I turn to our plan, I want to address the recent purchase of 9.9%
   of NEXTDC shares by Ackland Investments No.1, a vehicle owned equally by
   Goodman Group and Digital Realty. For those who are not aware, Goodman
   Group and Digital Realty are competitors of NEXTDC.
   We believe that the acquisition of shares by competitors of NEXTDC is
   proof of the strategic value and importance of NEXTDC’s assets in a market
   where built and contracted infrastructure is extremely attractive and
   valuable.
   In their statement released to the ASX on 9 November 2026, Goodman and
   Digital Realty said that neither party has “any present intention of
   submitting a control proposal, or making a takeover offer for NEXTDC,”
   although each reserves its right to do so should circumstances change. The
   Board has not received any formal proposal from Goodman, Digital Realty or
   Ackland, and is not in possession of any takeover proposal at this time.
   Any bona fide proposal from any credible parties will be considered by the
   Board on its merits and in the best interests of all NEXTDC shareholders.
   We will keep the market informed in line with our continuous disclosure
   obligations. There is no action required from NEXTDC shareholders on this
   matter.
   The Board’s priority is maximising value for all shareholders as NEXTDC
   delivers the plan I am about to describe.

   iii) Our Plan to Deliver Value: Five Pillars
   The Board and Executive Team are focused on five priorities to deliver
   near-term results and long-term value for our shareholders:

    1. Executing the M3 program
    2. Delivering projects and cash flow
    3. Capital discipline
    4. Maintaining balance sheet strength; and
    5. Renewing the Board and strengthening governance

   The five pillars are focused on strengthening our governance to build
   sustainable shareholder value and regain market confidence.
   Progress on these initiatives will be reported at the first half results
   in February 2027.

   iv) Executing the M3 Program
   Construction continues at M3 on the approved development of contracted
   customer capacity. The previously announced delay relates to the timing of
   the next increase in power supply to M3.
   The Board is working closely with Jemena to progress the M3 program – I
   have been in direct contact with the Chairman of Jemena, about a path
   forward.  We are proactively supporting Jemena’s consultation and approval
   process, as we appropriately can.
   As the NEXTDC and Jemena teams progress a path forward, the Board is
   maintaining clear oversight of M3, including direct Board sponsorship of
   the community engagement program.
   My fellow Board members, Debbie Page and Eileen Doyle, have been appointed
   as Board sponsors for this process, and we are adding a permanent
   Community Engagement Manager for M3.
   Since the M3 update, the Non-Executive Directors have voluntarily reduced
   their fees by 10%, and we withdrew Resolution 5, which sought an increase
   in the fee pool. Craig has agreed to forgo his FY27 short- and long-term
   incentives, so Resolution 7 has also been withdrawn.
   A Community Consultative Committee is being established to provide an
   ongoing forum for residents and stakeholders, which Craig will tell you
   more about shortly. The objective is to improve the M3 timeline while
   working towards a power solution and building a stronger, more
   constructive relationship with the community.
   The Board is also evaluating options for a community benefit framework as
   part of a broader engagement plan for how NEXTDC supports communities
   everywhere we operate, beyond M3.

   v) Capital Discipline, Delivering Projects and Cash Flow
   Our priority over the next two years is clear: complete the capacity we
   have already contracted, hand it over to customers and convert that
   capacity into billing revenue and cash flow.
   Our record-level Forward Order Book provides substantial visibility over
   future growth as that contracted capacity progressively comes online.
   The focus is therefore increasingly on execution and conversion –
   completing construction, securing the required power and infrastructure,
   achieving customer acceptance and commencing billing.
   As contracted capacity transitions into billing, we expect to see the
   benefits flow through to higher revenue, EBITDA and operating cash flow,
   supporting a more mature and cash-generative business.
   We have undertaken a detailed review of our capital expenditures, and our
   revised capital program reinforces this priority.
   Our review has confirmed FY27 capital expenditure guidance of A$4,500m to
   A$5,000m, a like-for-like reduction of A$980m, or 17% to 19%, from the
   initial FY27 guidance provided on 27 August 2026. The majority of the FY27
   capital expenditure is focused on existing contracts at S4, M2, M3 and
   KL1.
   As announced, uncontracted development projects and new land acquisitions
   are on hold. They will be considered only when supported by customer
   contracts at returns above our cost of capital, where key delivery
   dependencies such as power and planning are sufficiently advanced in
   consultation with relevant government and community stakeholders, and
   where incremental funding is in place.
   We continue to take a disciplined approach to capital allocation, with a
   focus on capturing value for shareholders.

   vi) Balance Sheet Strength
   The Board is committed to maintaining balance sheet strength. NEXTDC has
   substantial liquidity and is in compliance with its financial covenants as
   of the last test date. We also expect to comply at the next test date on
   31 December 2026.
   Our asset base exceeds A$10bn, including A$5.8bn of property, plant &
   equipment as well as A$3.2bn of investment properties. We continue to
   explore capital recycling opportunities, including a joint venture
   structure for our S4 Sydney campus.
   Current funding supports execution of our contracted capacity, and we will
   continue to be very disciplined about capital deployment. We do not expect
   to raise capital from shareholders at this time to deliver our current
   contracted customer capacity.

   vii) Board Renewal: A Phased Approach
   An orderly board renewal process is underway. As we announced last month,
   I will retire from the NEXTDC Board after a short handover once the new
   Chairman is appointed.
   We expect to appoint a new Chairman and an additional independent director
   in the first calendar quarter of 2027, subject to identifying suitable
   candidates.
   Stuart Davis is standing for re-election to support continuity during this
   process, then he intends to step down once the new directors are in place.
   For the director search, we’re targeting relevant capabilities in data
   centres, energy, infrastructure development and capital management.
   This board renewal program is designed to provide minimal disruption
   during a critical period. The Board believes continuity and stability
   through this transition is in the best interests of shareholders, and we
   ask shareholders to support the re-elections of Mr Davis, Dr Doyle and Mrs
   Leftakis.

   viii) Governance: Listening and Taking Action
   The 2025 remuneration vote sent a clear message to the Board. Shareholders
   have asked for clearer accountability and greater alignment between
   executive rewards and returns.
   We've carefully evaluated a broad range of shareholder feedback and
   responded - in our Annual Report and our recent responses to proxy
   advisers - to explain how our remuneration framework supports long-term
   shareholder value creation.
   We believe that the GIP reflected extenuating circumstances and we
   acknowledge the right of shareholders to vote on similar initiatives in
   the future. Likewise, we have heard you on our exercise of discretion
   under the FY22 LTI program and the need to continue to align remuneration
   increases with performance.
   Our view on pay is that it should appropriately reflect the market given
   scarcity of talent and complexity, scale and the expansion of the
   business. We continue to evaluate remuneration to ensure it remains
   fit-for-purpose, rewards and retains critical talent and has strong
   pay-for-performance alignment.
   It is important to note that proxies lodged before today's meeting show
   72.03% of votes against the Remuneration Report. That means the Company
   will record a second strike today, and Resolution 8, the conditional spill
   resolution, will be put to the meeting.
   We strongly believe a spill meeting would be destabilising and add cost
   and distraction at exactly the time when the Board and management need to
   focus on delivering for all shareholders.
   The Board recommends that you vote against Resolution 8, and I intend to
   vote all available undirected proxies against it.
   We look forward to continuing our engagement with shareholders in FY27. 
   Before handing over to Craig, I want to reiterate that we are focused on
   delivering our commitments through measurable actions and strong
   oversight.
   Governance actions matter, but execution is what will ultimately rebuild
   trust. That is why Board continuity, alongside renewal, matters through
   this transition.
   Thank you for your support, and I will now hand over to Craig to step you
   through the business highlights and the NEXTDC team’s plan of action.

   CEO’s Address
   Thank you, Doug, and good morning. This is my fifteenth AGM as your CEO,
   and it is the hardest. I know many of you are disappointed. I understand
   why. I want to start with M3.
   As CEO, I am accountable for delivery. Power, planning approvals,
   construction and community support are all part of delivery. We rely on
   partners for each of them, and they have their own responsibilities. That
   does not change mine. At M3 we needed to work more closely with our power
   and construction partners, and with the community. We are now doing that.
   The rest of the business is performing. FY26 was a record year. We support
   thousands of customers every day, and our contracted forward order book,
   which includes the affected M3 contracts, is the largest in our history.

   i) An Operating Platform to Meet Growing Demand
   Demand for high-quality, secure and reliable data centre capacity is the
   strongest I have seen in my time as CEO.
   Cloud and AI remain the structural drivers of demand, even as capital
   markets and technology valuations move around.
   We operate 18 data centres across Australia and Malaysia, including
   Australia’s only national network of Uptime Institute certified Tier III
   and IV facilities.
   We have five sites in development. All uncontracted development projects
   are on hold while we deliver the forward order book. Demand is not our
   constraint. Delivery is.
   We build on industrial land, close to power, network connectivity and our
   customers. In the past we relied on formal council and state planning
   processes to set the standard and own the conversation with the community.
   That is no longer enough.
   We will now engage earlier and directly, alongside our power and
   construction partners.

   ii) The M3 Expansion. We Are Taking Action
   First, some context. M3 is not a new development. It has been under
   development since 2021, in an industrial precinct in West Footscray.
   Stages 6 and 7 are the final stages of the entire campus.
   Over those years, community views on industrial areas have changed, and
   opposition to data centres and AI has grown, locally and globally. That is
   the environment we are now building in.
   Let me set out what happened. Additional power for M3 requires Jemena to
   install new power lines. Residents and community stakeholders raised
   concerns about the size of new power poles. Jemena then suspended those
   works, citing safety concerns and a lack of access to work sites resulting
   from community opposition.
   Those concerns deserved to be heard earlier. Jemena has recognised that
   its community engagement and consultation around the network upgrades was
   insufficient, and it is strengthening its approach.
   None of that changes where accountability sits. The upgrade serves our
   project and our customer. Delivering that project is our job, and I am
   accountable for it.
   On 21 October 2026 we informed the market that the delay to new grid
   supply would affect our ability to fully deliver some customer contracts
   at M3, and we revised our FY27 guidance.
   Approximately A$140m of each of net revenue and Underlying EBITDA
   associated with the affected M3 contracts sitting outside of FY27 guidance
   until its contribution can be reliably estimated. The affected M3 capacity
   remains under contract, subject to the customer’s rights, and construction
   continues.

   iii) M3 Action Plan in Progress
   With Jemena, we are progressing several pathways in parallel to bring
   power forward:

    1. alternative routes both through industrial streets and underground;
    2. alternative substations;
    3. upgrades to existing feeders; and
    4. broader grid options.

   Work on power options for M3 is well under way. Once Jemena’s technical
   solution is finalised, Jemena will lead any community consultation and
   approvals process. We will fully support it.
   The next milestones, including the timing Jemena has advised, are at the
   bottom of this slide. We continue to engage with the affected customer,
   supporting their daily operations and working closely with them on the
   technical solutions.
   The planning decision for Stages 6 and 7 sits with the Victorian
   Government. We expect that process to resume after the Victorian state
   election.
   I will report on progress at our half-year result in February, and earlier
   if there is something material to report.

   iv) Building trust within our communities
   M3 has changed how we plan, build and operate alongside our neighbours.
   For more than 15 years we have built data centres across this country.
   What earned trust then is not enough now. Community expectations have
   moved in the age of AI, and we must move with them.
   At M3, we have reviewed our community engagement, and the findings are
   shaping a formal M3 Community Engagement Plan. We are establishing a
   Community Consultative Committee, a standing forum for residents and local
   stakeholders to raise issues with us directly. We are also developing a
   Community Engagement Plan for every site in Australia and in Asia.
   The Board oversees that work through its Sustainability Committee and two
   Board sponsors.
   We have launched a dedicated M3 website and contact channels and
   introduced defined response times for complaints and enquiries. We are
   providing more regular information on construction, generators and air
   quality. These standards apply to everyone who works on our sites,
   including our builders.
   Our company-wide approach is built around the five commitments on this
   slide: engage early and listen, plan responsibly, respect our neighbours,
   show our progress, and create value that lasts.

   v) S4 Sydney Development in Progress
   Moving on to S4 in Western Sydney, which is our largest contracted
   development. 250MW of the planned 365MW IT load is customer contracted,
   and construction is under way.
   Power arrangements are in place for our contracted capacity at S4. Phase 1
   is under construction and is expected to begin billing in FY28. Phase 2 is
   in the NSW planning process.

   vi) Our Commitments in Action: Water Recycling
   The Conexa / AquaNet connection at S4 is a tangible example of responsible
   infrastructure that benefits both the site and the wider community. We
   understand from Conexa that it is Australia’s largest recycled water
   connection to a data centre.
   It also relieves pressure on a wastewater system equivalent to
   approximately 35,000 homes.
   Using water for heat rejection is highly efficient and uses less energy,
   meaning a better PUE.  Using recycled water means minimising the impact on
   Sydney's potable water network.

   vii) FY27 Guidance Upgrade
   Now, I’d like to update you on our FY27 guidance. This is an upgrade on
   our 21 October guidance. It is still below our August guidance, because
   the M3 contracts are excluded.
   Upgraded FY27 net revenue guidance is now A$485m to A$500m. This reflects
   strong sales and revenue growth, and greater confidence in the timing of
   customer delivery, outside the affected M3 contracts. We raised the bottom
   end by A$10m and the top end is unchanged at A$500m.
   Revised Underlying EBITDA guidance is increased to A$260m to A$275m. This
   is 8% above FY26 Underlying EBITDA of A$248.8m at the mid-point. The
   change is driven by cost savings from focusing operating spend on
   delivering capacity to customers, together with higher expected net
   revenue.
   Both ranges exclude the affected M3 contracts until their contribution can
   be reliably estimated.
   Any service level credits that become payable on those contracts could
   reduce Underlying EBITDA below this range.
   FY27 capital expenditure guidance is reaffirmed at A$4.5 billion to A$5
   billion, following completion of our capital expenditure review.

   Three final comments.

    1. First, to our team. Mission-critical customers across the region rely
       on you every day. Thank you for your hard work and dedication.
    2. Second, to our Board. Thank you for your commitment, and for the time
       you have given through a demanding period.
    3. Third, to our shareholders. We started with one site in Brisbane.
       Today we operate 18. M3 is a serious setback. Solving it is our first
       priority, and we will see it through. We will work to earn back your
       trust and the trust of the community around M3. I will report to you
       on progress in February.

   Outside M3, the business is performing, and demand is the strongest I have
   seen. Our job is to deliver the value in this business for our
   shareholders. That is what we will do.
   Thank you.

   NEXTDC – where the cloud lives.

   Authorised for release by the Board of NEXTDC Limited.
   For more information:
   Simon Guzowski
   T: +61 2 8072 4943
   E: [email protected]
   NEXTDC Investor Centre: www.nextdc.com/our-company/investor-centre

   About NEXTDC
   NEXTDC is an ASX 100-listed technology company and Asia’s most innovative
   Data Centre-as-a-Service provider. We are building the infrastructure
   platform for the digital economy, delivering the critical power, security
   and connectivity for global cloud computing providers, enterprise, and
   Government.

   NEXTDC is recognised globally for the design, construction, and operation
   of Australia’s only network of Uptime Institute certified Tier IV
   facilities, and one of the only data centre operators in the Southern
   Hemisphere to achieve Tier IV Gold certification for Operational
   Sustainability. NEXTDC has a strong focus on sustainability and
   operational excellence through renewable energy sources and
   delivering world-class operational efficiency. Our data centres have been
   engineered to deliver exceptional levels of efficiency and the industry’s
   lowest Total Cost of Operation through NABERS 5-star energy efficiency.

   NEXTDC’s corporate operations have been certified carbon neutral under the
   Australian Government’s Climate Active Carbon Neutral Standard.

   Our Cloud Centre partner ecosystem is Australia’s most dynamic digital
   marketplace, comprising carriers, cloud providers and IT service
   providers, enabling local and international customers to source and
   connect with cloud platforms, service providers and vendors to
   build complex hybrid cloud networks and scale their critical IT
   infrastructure services.

   NEXTDC is where the cloud lives®.
   To learn more, visit www.nextdc.com
    

   End of Inside Information

   ══════════════════════════════════════════════════════════════════════════

   19-Nov-2026 CET/CEST News transmitted by [5]EQS Group

   View original content: [6]EQS News

   ══════════════════════════════════════════════════════════════════════════

   Language:    English
   Company:     NEXTDC Limited
                20 Wharf Street
                4000 Brisbane City
                Australia
   ISIN:        AU000000NXT8
   Listed:      Vienna Stock Exchange (Vienna MTF)
   LEI Code:    529900RTERU3X7G3D672
   EQS News ID: 2439072


    
   End of Announcement EQS News Service


   2439072  19-Nov-2026 CET/CEST

   https://nwr.eqs-cockpit.com/fncls2.ssx?application_id=2439072&application_name=news&site_id=apa_ots_austria~~~18b544d0-9c71-4160-bd95-cc8b9aff9fbf

References

   Visible links
   1. https://nwr.eqs-cockpit.com/fncls2.ssx?fn=redirect&url=2be925ac0334ae7b4f51fbaee4a6daf0&application_id=2439072&site_id=apa_ots_austria~~~18b544d0-9c71-4160-bd95-cc8b9aff9fbf&application_name=news
   2. https://nwr.eqs-cockpit.com/fncls2.ssx?fn=redirect&url=f5d50dc7e8798b6eb177f7955e598e60&application_id=2439072&site_id=apa_ots_austria~~~18b544d0-9c71-4160-bd95-cc8b9aff9fbf&application_name=news
   3. https://nwr.eqs-cockpit.com/fncls2.ssx?fn=redirect&url=b1ee34073a49ccf91509d972a3c2ae3b&application_id=2439072&site_id=apa_ots_austria~~~18b544d0-9c71-4160-bd95-cc8b9aff9fbf&application_name=news
   4. https://nwr.eqs-cockpit.com/fncls2.ssx?fn=redirect&url=b1ee34073a49ccf91509d972a3c2ae3b&application_id=2439072&site_id=apa_ots_austria~~~18b544d0-9c71-4160-bd95-cc8b9aff9fbf&application_name=news
   5. https://nwr.eqs-cockpit.com/fncls2.ssx?fn=redirect&url=f5d50dc7e8798b6eb177f7955e598e60&application_id=2439072&site_id=apa_ots_austria~~~18b544d0-9c71-4160-bd95-cc8b9aff9fbf&application_name=news
   6. https://nwr.eqs-cockpit.com/fncls2.ssx?fn=redirect&url=efa854809bc10f7995c7ac8f166cd35a&application_id=2439072&site_id=apa_ots_austria~~~18b544d0-9c71-4160-bd95-cc8b9aff9fbf&application_name=news

OTS-ORIGINALTEXT PRESSEAUSSENDUNG UNTER AUSSCHLIESSLICHER INHALTLICHER VERANTWORTUNG DES AUSSENDERS - WWW.OTS.AT |

Bei Facebook teilen.
Bei X teilen.
Bei LinkedIn teilen.
Bei Xing teilen.
Bei Bluesky teilen

Stichworte

Channel